With the recent international economic downturn, most engineering, procurement, and construction (EPC) contractors are incurring deficits in their floating, production, storage, and offloading unit (FPSO) projects. Numerous reasons underpin these situations. One of the most important reasons is the cost-estimation failure. The cost estimation is the key contractual point and mainly depends on a weight estimation of the FPSO topsides. Because the topsides contain a lot of equipment and complex structures, it is very difficult to make an estimation at the contractual stage. To overcome this problem, many methods have been proposed to estimate the weight of offshore topsides; however, most of the methods involve the top–down approach, making it difficult to obtain a sufficiently accurate prediction for field-work usage in terms of the weight estimation. Therefore, a work breakdown structure (WBS) for the performance of the weight-estimation process is proposed in this study. Using the WBS of the FPSO topsides, the corresponding presentation of the weight-estimation process makes the process usable in the field work regarding the WBS-item estimations. Accordingly, estimates of the detailed units (disciplines, modules, and areas) inside the topside that were previously not possible were performed. In addition, a prototype program was developed using the proposed method, and the applicability of the proposed method was evaluated through the application of three projects.

References

1.
Rui
,
R.
, and
Walker
,
J.
,
2015
, “
Upstream Offshore-Facility Weight-Growth Study
,”
Oil Gas Facil.
,
4
(
2
), pp.
107
112
.
2.
Bolding
,
A.
,
2001
, “
Bulk Factor Method Estimates FPSO: Topsides, Weight
,”
Oil Gas J.
,
99
(10), pp.
49
53
.http://www.ogj.com/articles/print/volume-99/issue-10/drilling-production/bulk-factor-method-estimates-fpso-topsides-weight.html
3.
Rasmussen
,
K. R.
,
2015
, “
Optimisation of Central Offshore Process Equipment and Weight Estimations
,”
B.Sc. thesis
, Aalborg University, Aalborg, Denmark, pp.
22
53
.http://projekter.aau.dk/projekter/files/207761053/EN7_2_Optimisation_of_Central_Offshore_Process_Equipment_and_Weight_Estimations.pdf
4.
Aasen
,
R.
, and
Bjorhovde
,
S.
,
2010
, “
Early Stage Weight and Cost Estimation Using Parametric Formulas and Regression on Historical Data
,”
69th Annual Conference of the Society of Allied Weight Engineers
(SAWE), Virginia Beach, VA, May 23–26, Paper No.
3515-S
.https://www.yumpu.com/en/document/view/12283572/early-stage-weight-and-cog-estimation-using-shipweight
5.
Watson
,
D. G. M.
, and
Gilfillan
,
A. W.
,
1976
, “
Some Ship Design Methods
,”
Tran. R. Inst. Naval Archit.
,
119
, pp.
279
324
.http://160.75.46.2/staff/insel/LectNotes/ShipDesign/watson%20gilfillian.pdf
6.
Ha
,
S.
,
Seo
,
S. H.
,
Roh
,
M. I.
, and
Shin
,
H. K.
,
2016
, “
Simplified Nonlinear Model for the Weight Estimation of FPSO Plant Topside Using the Statistical Method
,”
Ship Offshore Struct.
,
11
(
6
), pp.
603
619
.
7.
Koza
,
J. R.
,
1992
,
Genetic Programming: On the Programming of Computers by Means of Natural Selection
,
MIT Press
,
Cambridge, MA
, pp.
73
120
.
8.
Koza
,
J. R.
,
1994
,
Genetic Programming II: Automatic Discovery of Reusable Programs
,
MIT Press
,
Cambridge, MA
, Chap. 2.
9.
Banzhaf
,
W.
,
Nordin
,
P.
,
Keller
,
R. E.
, and
Francone
,
F. D.
,
1997
,
Genetic Programming: An Introduction on the Automatic Evolution of Computer Programs and Its Applications
,
Morgan Kaufmann
,
San Francisco, CA
, pp.
105
236
.
10.
Ha
,
S.
,
Um
,
T. S.
,
Roh
,
M. I.
, and
Shin
,
H. K.
,
2017
, “
A Structural Weight Estimation Model of FPSO Topsides Using an Improved Genetic Programming Method
,”
Ship Offshore Struct.
,
12
(
1
), pp.
43
55
.
11.
Cohen
,
J.
,
Cohen
,
P.
,
West
,
S. G.
, and
Aiken
,
L. S.
,
2002
,
Applied Multiple Regression/Correlation Analysis for the Behavioral Sciences
, 3rd ed.,
Lawrence Erlbaum Associates
,
Mahwah, NJ
, pp.
64
100
.
12.
Xin
,
P.
,
Khan
,
F.
, and
Ahmed
,
S.
,
2016
, “
Layout Optimization of a Floating Liquefied Natural Gas Facility Using Inherent Safety Principles
,”
ASME J. Offshore Mech. Arct. Eng.
,
138
(
4
), p. 041602.
13.
Yazdani
,
M.
, and
Jolai
,
F.
,
2016
, “
Lion Optimization Algorithm (LOA): A Nature-Inspired Metaheuristic Algorithm
,”
J. Comput. Des. Eng.
,
3
(
1
), pp.
24
36
.
14.
Tejani
,
G. G.
,
Savsani
,
V. J.
, and
Patel
,
V. K.
,
2016
, “
Adaptive Symbiotic Organisms Search (SOS) Algorithm for Structural Design Optimization
,”
J. Comput. Des. Eng.
,
3
(
3
), pp.
226
249
.
15.
Kim
,
S. K.
,
Roh
,
M. I.
, and
Kim
,
K. S.
,
2017
, “
Arrangement Method of Offshore Topside Based on an Expert System and Optimization Technique
,”
ASME J. Offshore Mech. Arct. Eng.
,
139
(
2
), p. 021302.
16.
Cocodia
,
E. O.
,
2008
, “
Creating Better Cost Estimates for Floating Offshore Structures by Assessing Cost Correlation and Understanding Risk
,”
Eighteenth International Offshore and Polar Engineering Conference
, Vancouver, BC, Canada, July 6–11,
SPE
Paper No. ISOPE-I-08-192.https://www.onepetro.org/conference-paper/ISOPE-I-08-192
17.
Tausworthe
,
R. C.
,
1980
, “
The Work Breakdown Structure in Software Project Management
,”
J. Syst. Software
,
1
, pp.
181
186
.
18.
Roh
,
M. I.
,
Seo
,
S. H.
,
Shin
,
H. K.
,
Ku
,
N. K.
,
Ha
,
S.
, and
Kim
,
K. S.
,
2014
, “
Simplified Model for the Weight Estimation of Floating Offshore Plant Using the Statistical Method
,”
ASME
Paper No. OMAE2014-24379.
19.
Kim
,
S. H.
,
Roh
,
M. I.
,
Kim
,
K. S.
, and
Oh
,
M. J.
,
2017
, “
Big Data Platform Based on Hadoop and Application to Weight Estimation of FPSO Topside
,”
J. Adv. Res. Ocean Eng.
,
3
(
1
), pp.
32
40
.
You do not currently have access to this content.