Abstract

This paper investigates the use of a high reliability microgrid to supply emergency electrical power to a nuclear facility following loss of offsite power accident. Majority of the nuclear facilities around the world utilize diesel generators (DGs) and battery banks as emergency power to back up the grid power supply. This power supply configuration represents the concept of the microgrid system. The research work proposes reliability improvement of the emergency power supply by introducing distributed energy sources and large-scale energy storage systems. The proposed system was modeled with reliability block diagrams (RBDs) and analyzed with Monte Carlo simulation (MCS) to evaluate the system's reliability in terms of loss of power supply probability (LPSP). The analysis takes into consideration the failure probability of the components combined with the power unavailability due to the intermittent energy sources. The results show that the proposed system reduces the LPSP.

References

1.
IAEA
,
2006
, “
Fundamental Safety Principles
,”
International Atomic Energy Agency
,
Vienna, Austria
, Standard No. SF-1 IAEA.
2.
IAEA
,
2012
, “
Safety of Nuclear Power Plants: Design
,”
International Atomic Energy Agency
,
Vienna, Austria
, Standard No: SSR-2/1 IAEA.
3.
Olivares
,
D. E.
,
Mehrizi-Sani
,
A.
,
Etemadi
,
A. H.
,
Canizares
,
C. A.
,
Iravani
,
R.
,
Kazerani
,
M.
,
Hajimiragha
,
A. H.
,
Gomis-Bellmunt
,
O.
,
Saeedifard
,
M.
,
Palma-Behnke
,
R.
,
Jimenez-Estevez
,
G. A.
, and
Hatziargyriou
,
N. D.
,
2014
, “
Trends in Microgrid Control
,”
IEEE Trans. Smart Grid
,
5
(
4
), pp.
1905
1919.
10.1109/TSG.2013.2295514
4.
Gogula
,
R. R.
,
2015
, “
A Sustainable Hybrid/Off Grid Power Generation Systems Suitable for a Remote Coastal Area in Oman
,”
Eighth IEEE GCC Conference and Exhibition
, Muscat, Oman, Feb. 1–4.10.1109/IEEEGCC.2015.7060054
5.
IAEA
,
2013
, “
Periodic Safety Review for Nuclear Power Plants
,”
International Atomic Energy Agency
,
Vienna, Austria
, Standard No: SSG-25 IAEA.
6.
World Nuclear Association (WNA)
,
2020
, “
Fukushima Daiichi Accident
,” London, UK, accessed Feb. 22, 2020, http://www.world-nuclear.org/info/Safety-and-Security/Safety-of-Plants/Fukushima-Accident/
7.
Rastler, D.,
2013
, “
Assessment of DC Backup Power Technology Options for Nuclear Power Generation Stations
,” Electric Power Research Institite, Palo Alto, CA, Product Id: 3002001937, accessed Feb. 22, 2020, https://www.epri.com/#/pages/product/000000003002001937/?lang=en-US
8.
ONR
,
2011
, “
Japanese Earthquake and Tsunami: Implications for the UK Nuclear Industry
,” Office for Nuclear Regulation, Bootle, UK, Report No. ONR‐FR‐REP‐11‐002.
9.
NEA/OECD,
2013
, “
The Fukushima Daiichi Nuclear Power Plant Accident: OECD/NEA Nuclear Safety Response and Lessons Learnt
,” Nuclear Energy Agency/Organisation for Economic Co-Operation and Development, Paris, France, Report No. 7161.
10.
Cepin
,
M.
,
2011
,
Assessment of Power Systems Reliability Methods and Applications
,
Springer-Verlag London, London, UK.
11.
Shi
,
X.
,
2015
, “
Micro-grid Reliability Modeling and Analysis Approaches
,” MS thesis, University of Connecticut Graduate School, Storrs, CT.
12.
IEEE
,
2007
, “
IEEE Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems
,” Power Systems Engineering Committee, IEEE, New York, Standard No. 493–2007.
13.
Kennedy
,
S.
,
2009
, “
Reliability Evaluation of Islanded Microgrids With Stochastic Distributed Generation
,”
IEEE
Power and Energy Society General Meeting
, Calgary, AB, Canada, July 26–30, pp.
1
8
.10.1109/PES.2009.5275731
14.
Ghahderijani
,
M. M.
,
Barakati
,
S. M.
, and
Tavakoli
,
S.
,
2012
, “
Reliability Evaluation of Stand-Alone Hybrid Microgrid Using Sequential Monte Carlo Simulation
,”
Second Iranian Conference on Renewable Energy and Distributed Generation
, Terhan, Iran, Mar. 6–8, pp.
33
38
.10.1109/ICREDG.2012.6190464
15.
Guocheng
,
S.
,
Jingtao
,
Z.
,
Xiaoyan
,
Z.
,
Cheng
,
L.
,
Yusen
,
Z.
,
Xiangyu
,
K.
, and
Xinpeng
,
L.
,
2016
, “
Reliability Analysis Method for Microgrid With Intermittent Distributed Generations
,”
China International Conference on Electricity Distribution (CICED)
, Xi'an, China, Aug. 10–13, pp.
1
5
.10.1109/CICED.2016.7576140
16.
AlMuhaini
,
M.
, and
Tuffaha
,
T.
,
2015
, “
Reliability Assessment of a Microgrid Distribution System With PV and Storage
,”
International Symposium on Smart Electric Distribution Systems and Technologies (EDST)
, Vienna, Austria, Sept. 8–11, pp.
195
199
.10.1109/SEDST.2015.7315206
17.
Zhang
,
P.
,
Li
,
W.
,
Li
,
S.
,
Wang
,
Y.
, and
Xiao
,
W.
,
2013
, “
Reliability Assessment of Photovoltaic Power Systems: Review of Current Status and Future Perspectives
,”
Appl. Energy
,
104
, pp.
822
833
.10.1016/j.apenergy.2012.12.010
18.
Koffler
,
R.
,
2003
, “
Transformer or Transformerless UPS
,”
Power Eng.
,
17
(
3
), pp.
34
36
.10.1049/pe:20030310
19.
Harb
,
S.
,
Kedia
,
M.
,
Zhang
,
H.
, and
Balog
,
R. S.
,
2013
, “
Microinverter and String Inverter Grid-Connected Photovoltaic System—A Comprehensive Study
,”
IEEE 39th Photovoltaic Specialists Conference (PVSC)
, Tampa, FL, June 16–21, pp.
2885
2890
.10.1109/PVSC.2013.6745072
20.
SunPower,
2020
, “
SunPower® Performance Series | P17®
Datasheet,” San Jose, CA, Document # 516031 Rev H /LTR_US, accessed Feb. 22, 2020, https://us.sunpower.com/sites/default/files/media-library/data-sheets/ds-sunpower-p17-355-commercial-solar-panels.pdf
21.
Zhou
,
D.
,
Blaabjerg
,
F.
,
Franke
,
T.
,
Tønnes
,
M.
, and
Lau
,
M.
,
2015
, “
Comparison of Wind Power Converter Reliability With Low-Speed and Medium-Speed Permanent-Magnet Synchronous Generators
,”
IEEE Trans. Ind. Electron.
,
62
(
10
), pp.
6575
6584
.10.1109/TIE.2015.2447502
22.
Echavarria
,
E.
,
Hahn
,
B.
,
Van Bussel
,
G. J.
, and
Tomiyama
,
T.
,
2008
, “
Reliability of Wind Turbine Technology Through Time
,”
ASME J. Sol. Energy Eng.
,
130
(
3
), p.
031005
.10.1115/1.2936235
23.
Carroll
,
J.
,
McDonald
,
A.
, and
McMillan
,
D.
,
2015
, “
Reliability Comparison of Wind Turbines With DFIG and PMG Drive Trains
,”
IEEE Trans. Energy Convers.
,
30
(
2
), pp.
663
670
.10.1109/TEC.2014.2367243
24.
Shahan, Z.
,
2015
, “
38,000 Tesla Powerwall Reservations in Under a Week
,” Clean Technica, accessed Feb. 22, 2020, https://cleantechnica.com/2015/05/07/38000-tesla-powerwall-reservations-in-under-a-week-tesla-elon-musk-transcript/
25.
U.S. Nuclear Regulatory Commission, 1996,
Reliability Study: Emergency Diesel Generator Power System, 1987-1993
,”
Vol.
5, U.S. Nuclear Regulatory Commission, Washington DC, Report No. NUREG/CR-5500.
26.
IEEE
,
1995
, “
IEEE Standard Criteria for Diesel Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations
,”
Nuclear Power Engineering Committee
,
IEEE, New York
, Standard No. 387–1995.
You do not currently have access to this content.